Project: Recovery of Tunnel Boring Machine
Location: Milwaukee, Wisconsin
Client: Jay Dee Contractors, Inc.
Description: During the construction of an uderground tunnel in Milwaukee, Wisconsin the Tunnel Boring Machine (TBM) encountered large obstructions which caused damage to the machine and suspended tunnel progress. Ground freezing, using liquid nitrogen to create a strong watertight frozen earth envelopes around the TBM.

Layne crews worked around the clock to install the necessary freeze pipes. The extremely low temperature of liquid nitrogen formed the frozen wall in less than four days. After freezing, excavation proceeded from the ground surface, enabling crews to perform the necessary repairs.

This project demonstrated the ability of Layne to respond quickly to an emergency situation, and exhibited the potential of liquid nitrogen to freeze ground rapidly when the need for immediate groundwater control is necessary.
Please enter your e-mail address below to be notified of product / information updates!
 
Geotechnical Construction Group
W229 N5005 DuPlainville Road
Pewaukee, Wisconsin 53072
Tel: 800.407.4449
Tel: 262.246.4646
Fax: 262.246.4784
E-mail: jasopko@groundfreezing.com

GROUNDFREEZING HOME | PROJECTS | TECHNICAL PAPERS | PROFILE | CONTACT US

© 2008 Layne Christensen Company. All rights reserved.